• Client: BOCCARD France
  • Location: Corsica, France
  • Period:
    Scope: Execution and montage of 8 tanks for technological fluids (max. diameter 30 m) ; Montage, alignment and put into operation of diesel MAN motors and electric generators ; Montage and put into operation steel structure cooling towers; Montage of 7 overhead cranes; Execution of steel structure and piping; Execution of fire fighting installation.
    Period : April 2012 – March 2014