A.1 |
Installation and repair at: Steam boilers with Qmax=120 t/h, pmax=40 bar, Tmax=540oC; Hot water boilers with Dmax= 100 Gcal/h si pmax=22 bar (C1) |
BC/CR4/A,C/4,5/1118/6/ 01.02.2024 |
A.2 |
Technical checking in use for investigations / technical examinations for steam and hot boilers, parameters: Qmax= 120 t/h pmax= 140 bar; Tmax=400 0C/ Dmax=50 Gcal; pmax= 140 bar |
DISPR/CR4/E/4,5/3772/4/ 29.02.2024 |
A3. |
Maintenance by chemical washing at Steam boilers, having Qmax = 250 t/h, pmax = 40 bar, tmax = 540oC; Hot water boilers, having Dmax = 100 Gcal/h, pmax = 22 bar, Tmax > 110oC |
BC/CR4/G/4,5/1968/3/ 24.11.2023 |
B.1 |
Installation and repair at hot water boilers with Pmax= 10000 kW; Tmax=110 0C and low pressure boilers with: Qmax= 5 t/h; pmax= 0,5 bar ( C9 ) |
BC/CR4/A,C/17,18/1123/5/ 01.02.2024 |
B.2 |
Technical checking in use for investigations/ technical examinations for hot water and low pressure steam boilers, with parameters. Pmax= 10000 kW; Qmax= 5 t/h |
DISPR/CR4/E/17,18/3773/4/ 29.02.2024 |
C.1 |
Installing, repairing metal pipes for steam and hot water, with parameters avand pmax
= 40 bar, Tmax=+440oC ( C10 ) |
BC/CR4/B,C/19/1124/5/ 23.11.2023 |
C.2 |
Technical checking in use for investigations / technical examinations to metal pipes for steam and hot water , with parameters: pmax= 140 bar; Tmax=440 0C |
DISPR/CR4/E/19/3775/4/ 29.02.2024 |
D. |
Installation, commissioning, maintenance and repairs to: combustion installation and automation system for boilers and central heating systems (C11 ) |
BC/CR4/N/20,53/1125/5/ 01.02.2024 |
E. |
Installation, repair, maintenance and technical checking in use of fuel consuming equipment, hot water and low pressure steam boilers. (PTA1) |
BC/CR4/A,F,D/1,2,3/1117/4/ 01.02.2024 |
F.1 |
Repair metal containers under pressure, with parameters : Vmax=100.000 litri, pmax=250bar, Tmin= -200oC, Tmax= 440oC (C4) |
BC/CR4/C/8/1119/5/ 24.11.2023 |
F.2 |
Repairing tanks under pressure for compressed, liquified or dissolved gas, with parameters: Vmax=100.000 litri, pmax=25 bar, Tmin= -200oC, Tmax= 200oC (C12 ) |
BC/CR4/C/21/1126/5/ 23.11.2023 |
F.3 |
Technical checkings in use for investigations / examinations for stable pressure metal containers, with parameters: Vmax=250 m3; pmax= 320 bar; Tmin=-200 0C; Tmax=440 0C |
DISPR/CR4/E/8/3771/4/ 29.02.2024 |
G.1 |
Installing and repair metal pipes for fluids under pressure, with parameters: pmax=250 bar, Tmin= -200oC, Tmax= 440oC (C6) |
BC/CR4/B,C/13/1120/5/ 24.11.2023 |
G.2 |
Technical checking in use for investigations/ examinations metal pipes for fluids under pressure, with parameters: pmax= 250 bar; Tmin=-200 0C; Tmax=440 0C |
DISPR/CR4/E/13/3774/4/ 29.02.2024 |
H. |
Checking (at opening - closing), repair and control safety valves, with parameters: DNmax=450 mm, pmax=400 bar (C 7) |
BC/CR4/K,L/14/1121/5/ 23.11.2023 |
I. |
Installing, Repairing, Montagen LPG installations to households and industrial, with parameters: Vmax=30000 l; pmax= 18 bar; Tmin= -40 0C; Tma x = 50 0C |
BC/CR4/A,B,C/16/1127/5/ 23.11.2023 |
J. |
Installation: Movable crane without railways: Sn ≤ 250 t; Movable crane with railways: Sn ≤ 145 t; Crane arm and/or rotating platform working at fixed / movable on railways: Sn ≤ 10 t |
BC/CR4/B/24,25,26/1147/3/ 13.07.2023 |
|
Repair, Overhaul, Maintenance: Movable crane without railways: Sn ≤ 250 t; Movable crane with railways: Sn ≤ 145 t; Crane arm and/or rotating platform working at fixed / movable on railways: Sn ≤ 10 t |
BC/CR4/C,O/24,25,26/2148/0/ 13.07.2023 |
K. |
Operator in charge for technical surveillance of installation/equipment under ISCIR – RSVTI operator. |
BC/ORD130/1384/0/ 10.04.2023 |